Get all your news in one place.
100's of premium titles.
One app.
Start reading
Birmingham Post
Birmingham Post
Business
Hannah Baker

MYSTERIOUS: Consultation on hinkley point c fish protection measures launches - You Need To See This

A consultation on plans to change the way sea water and fish are discharged at Somerset nuclear power plant Hinkley Point C has been launched by the government’s environment agency.

The Bridgwater power station is proposing a change to its Water Discharge Activity permit, which currently includes three mitigation measures to protect fish. These include: a fish recovery and return system, special water intakes to slow water down and an acoustic fish deterrent - a system that uses underwater sound to cause species of fish that can hear to swim away.

The plant, which is being constructed by French energy giant EDF, wants to remove conditions relating to the acoustic fish deterrent as it claims it is not required to protect the water quality of the Bristol Channel. A similar application in 2019 resulted in an appeal to the Secretary of State, which was dismissed last year.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.