Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

UNCOVERED: A waterway once is sewage carrier now - Caught on Camera

It has been 217 years since the Cochrane’s Canal, which later became the Buckingham Canal, came into existence. The canal’s construction, covering its entire stretch of roughly 420 kilometres from Pedda Ganjam in Andhra Pradesh to Marakkanam in Tamil Nadu, happened in phases throughout the major part of the 19th Century from 1806 to 1882.

Its importance as a major waterway diminished since the early 20th Century, mainly because of the expansion of the railways. There were significant spurts during the World Wars. But it remained a means for goods transport even till the 1960s. An official document had recorded that the value of goods transported through the entire stretch of the canal in 1951-52 was at least ₹20.73 crore, a remarkably high amount for those days. A report in The Hindu in September 1962 said 1.47 lakh tonnes of goods — such as rice, firewood, cotton, salt, shell, straw, coconuts, fish, oil, building materials and iron ore — were transported in 1961-62 through the canal in the Madras State alone.

The canal’s maintenance remained an issue since the early 20th Century as the revenue from transport proved inadequate to maintain the not-so-wide and shallow canal, which required regular desilting. Over the decades, other problems such as the canal becoming a point for sewage networks to drain, further decline in need for cargo transport and encroachments rendered it unusable.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.