Battery producer AMTE Power has identified Dundee as the preferred site for its first 'MegaFactory'.
This should have the capacity to produce more than 25,000 batteries per day, with revenue generation of over £200m per annum at full production.
The total required investment is estimated to be between £160m and 190m.