New Delhi: The Delhi Metro Rail Corporation (DMRC) will undertake a feasibility study to develop an integrated double-decker flyover-cum-Metro corridor along the proposed 16.5-km Keshav Puram-Rohini Sector 34 route under Phase V(B) of the Delhi Metro network.
The proposed consultancy, estimated to cost around Rs 2.08 crore, will examine the feasibility of constructing Metro infrastructure on the upper deck and an elevated road or flyover on the lower deck to ease traffic congestion along the corridor, according to a document.