The straightening of the Thevara-Perandoor (TP) canal at the triangular crossing of the railway near the Ernakulam South railway station should be taken up on priority basis for averting flooding in the Kammattipadam area of the Kochi Corporation, according to the Irrigation department.
The straightening of the canal will help the Corporation tackle the flood situation better as the canal will carry away significant quantities of floodwaters. The rapid urbanisation has badly affected the drainage system at Kammattipadam as natural drains in the region have been destroyed. Buildings have been constructed in such a way that the entire drainage system in the area has been blocked, according to the detailed project report (DPR).
Shifting of pipelines from the bed of the TP canal, extension of the drain from Kammattipadom to the canal for a length of 150 metres, reconstruction of the TP canal and the culvert below AL Jacob flyover, and dismantling of the ring bund across the canal have also been proposed.