Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

UNCOVERED: Fire preparedness at brahmapuram to be enhanced - Caught on Camera

An additional 12 fire hydrants will be installed at the waste dumping site of the Kochi Corporation at Brahmapuram at a total cost of ₹75 lakh as part of enhancing firefighting systems on the premises.

This is in addition to the existing five hydrants, of which only three are operational. The repair of the two remaining hydrants will be carried out within two days, according to decisions taken at a meeting convened by Industries Minister P. Rajeeve on Tuesday to review biomining work and fire preparedness at the site. The enhancement of firefighting systems was initiated following the massive fire at the site in March 2023.

Mr. Rajeeve said three water tanks with a capacity of 50,000 litres each would be constructed soon to meet water requirements in the event of an emergency. This is in addition to the existing tank with a similar capacity. Around 85% of the construction of access roads to various points across the dumping site was completed. An assessment will be carried out soon to check whether fire tender units can reach these points through the access roads. Steps would be taken to ensure that fire tender units having a capacity of 16 tonnes and 25 tonnes could move along the access roads, he said.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.