
Located in Dumfries and Galloway, the disused coal mine is to be transformed into a Pumped Storage Hydropower plant and wind farm – an ideal location for Extreme E to promote electric power and clean energy solutions.
The energy project was finally confirmed last October, as landowners Buccleuch and Foresight Energy Infrastructure Partners reached a deal that would see the latter lease the site and execute the energy generation project. This came almost a decade after the collapse of the mining operator in 2013.