
The proposal would see a temporary crossing above the existing bridge for pedestrians and cyclists while repairs are carried out
(Picture: Supplied)Hammersmith and Fulham Council is to seek planning permission for a double-decker solution to keep Hammersmith Bridge accessible while repairs are undertaken.
The design proposes a temporary crossing be fixed above the existing 1887-built suspension bridge, so drivers, walkers and cyclists can cross the Thames while repairs are carried out on the existing structure.