
With temperatures set to soar above 35 degrees next week, authorities have wrapped Hammersmith Bridge in giant pieces of foil to stop it from overheating.
The 135-year-old structure is currently undergoing £140million repair works and closed during similar heat in 2020 when the sun caused cracks in the cast iron to expand. It is currently only accessible to pedestrians and cyclists.