Get all your news in one place.
100's of premium titles.
One app.
Start reading
inkl
inkl

FOUND: How to secure a parking lot that already has a fence around it - You Need To See This

Separate the two threats before you spec anything

A fenced parking lot gets attacked in two ways, and the product that answers one does nothing about the other.

Opportunist theft is a person problem. Catalytic converters, tool boxes out of truck beds, wheels off a row of unsold vehicles. He's gone in a few minutes. Delay is the answer, and delay is measurable. LPS 1175 Issue 8 states it as a letter and a number: the letter (A to H) is the toolkit, the number is minutes of resistance. B3 covers bolt cutters, hammers, drills and crowbars, held off for three minutes. Those three minutes are tool contact time, and the test lets them fall anywhere inside a fifteen minute window. B3 is neither fifteen minutes of protection nor three minutes from the moment a crew arrives.

Organized vehicle attack is a mass and speed problem. A truck driven at the line to open it for the crew behind, or to reach the building beyond. Anti-climb performance has nothing to say about that. A 15,000 lb medium-duty truck at 40 mph carries energy welded mesh will not absorb, whatever the aperture or the height.

Most specifications fold both into one line item. The result is familiar: a rated fence on three sides, and a vehicle entrance a van could drive through at idle. Write the two threats down separately, and price them separately.

Match the barrier to the threat you actually have

Fencing stops people. Rated bollards and blockers stop vehicles. Height buys nothing across that line.

ASTM F2656 governs the vehicle side in the US. M30, M40 and M50 describe a 15,000 lb medium-duty truck stopped at 30, 40 or 50 mph. The P rating after it matters as much: P1 is penetration of 3.3 ft or less past the barrier, P2 runs 3.3 ft to 23 ft, P3 runs 23 ft to 98.4 ft. An M50 P3 barrier stopped the truck and still allows it 98 ft inside your lot. Where people walk decides which P you can accept.

K ratings still get quoted. SD-STD-02.01, the Department of State standard behind K4, K8 and K12, is withdrawn, and its 2003 update had already dropped penetration distance. K4 is roughly M30, K8 roughly M40, K12 roughly M50. PAS 68 is withdrawn as well, superseded by ISO 22343-1 in 2023. It measured penetration from the barrier's rear face, while ASTM F2656 and IWA 14-1 measure from the vehicle's leading edge. Same crash, better looking number. Comparing the two figures directly is a specification error.

A vehicle entrance needs a barrier that moves, and rising bollards rated for vehicle impact sit flush while the lot is open and rise when it closes or a credential is refused. Ask about foundation depth early, because drainage and ducting under a parking lot are rarely where the survey puts them. If a federal tenant is involved, look at UFC 4-022-03, the Department of Defense criteria for security fences and gates, named on CLD Physical Security Systems' hostile vehicle mitigation page.

Design the gate around how it will actually be used

A gate that holds a queue gets propped open. Once it's propped, everything upstream of it is decoration.

Do the arithmetic before picking a leaf type. Count the vehicles arriving in your busiest fifteen minutes, not your daily average. Take the cycle time off the manufacturer's data sheet, add the seconds your reader needs to decide, add the seconds a driver spends finding a card, then multiply. If the answer outruns your approach lane, the queue reaches the public road, and somebody will fix that by leaving the gate open.

On a wide opening, cantilever sliding gates for vehicle entrances carry the leaf on rollers set behind it, which keeps the running gear clear of the drainage line, grit and ice. Swing leaves need sweep space a parking lot rarely has spare, and that sweep gets drawn on the plan and parked on in practice.

Specify in writing what a security fence gate does when it loses power. Fail open and fail closed are very different security cases, and pedestrian exit has to work with the reader dead. Then put your throughput figure in the performance specification next to the rating. A gate that meets its rating and misses its cycle time has not met the spec.

Light the fence line first

Lighting designed for driver comfort fills the middle of the lot and leaves the boundary dark. The boundary is where the event starts.

Light the fence line and the ground outside it, then walk the perimeter after dark and look back at the cameras. Backlight destroys identification. A camera pointed at a bright bay past an unlit parking lot fence records a silhouette with no face and no plate. Uniformity counts for more than raw output. Bright pools with dark gaps between them make an approach route anyone can read.

Continuous light belongs at the main entrance. Motion triggered light belongs at the pedestrian gate and the back corner where your fence meets the neighbor's line. A light that switches on is an event in itself, and it tells a guard where to look. Put the lighting requirement in the camera specification rather than the electrical one.

Put one party on the hook for the interfaces

Fence, gate, bollards and cameras get bought as four packages from four suppliers, and the failures cluster in the joints.

The bollard foundation lands on the storm drain. The camera pole goes in where a fence post now blocks half its view. The gate motor wants a supply the electrical contractor priced before anyone had chosen a gate. None of that is hard engineering. Those are ownership problems, and they surface on site with the concrete already poured.

Name one party in the contract who owns the setting out and the install sequence. Ask for it at tender: have every bidder mark the interface points on the site plan and name who owns each. A bidder who can't do that on one page has told you something. A manufacturer whose range already covers fencing, gates and vehicle barriers can hold that coordination in one contract. CLD Physical Security Systems certifies its standard Securus mesh range up to SR4 and lists rated vehicle barriers beside it.

Start the next revision of your specification with two sentences. What a person on foot has to be delayed against, and what a vehicle has to be stopped at. Everything else follows, budget included. Write them before the first brochure arrives, because once a product is in the drawing the requirement gets reverse engineered to match it. A secure parking lot comes from deciding what you are defending against, then buying the thing that does it.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.