KOLKATA: Metro Railway got its 16th Medha rake on Wednesday, which left Dum Dum for the terminal Kavi Subhas station on its first commercial run at 12.06pm. It started rolling for its Down journey again at 11.10pm.
Metro now has 29 rakes for Line 1 or the Dakshineswar-Kavi Subhas corridor. All are air-conditioned. The Medha rakes are from the Integral Coach Factory near Chennai. The remaining 13 are older, made by BHEL.