Mumbai: The Maharashtra Pollution Control Board (MPCB) has directed Adani Renewable Energy One Ltd to stop excavation and construction work for its temporary camp in Satara district for allegedly beginning these without obtaining the necessary environmental clearance and permissions.
The labour camp in Satara's Patan taluka, some 300 kilometres from here, is part of the firm's 1500 MW Tarali Pumped Storage Project.