Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

EXPLAINED: Nhai awaiting nod to ready dpr for edappally aroor elevated highway | Vintage Vibes

Even as a 15-km elevated highway is being built in the Aroor-Thuravur NH 66 corridor, and a six-lane highway is being built in the Edappally-Muthakunnam NH 66 stretch, uncertainty prevails over the plight of an elevated highway that the National Highways Authority of India (NHAI) proposed on the Edappally-Aroor NH 66 Bypass.

This comes amid fears that the NH Bypass will become a choke point for vehicles from across the State that pass through the corridor.

Official sources said the 16-km Edappally-Aroor stretch, most of which passed through Kochi city and carried a whopping one lakh passenger car units (PCUs) daily, needed a six or eight-lane elevated highway. This is mainly because it would be tough to widen the congested and heavily built up Edappally-Vyttila four-lane stretch, where traffic hold ups are the norm.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.