The diaphragm wall of the Polavaram project is under a sheet of floodwater by Friday as a result of the flash flood in the Godavari river.
Excluding the spillway that was designed to withstand up to 50 lakh cusecs of inflow, there is an uncertainty on the structural stability of the other facilities of the irrigation project due to incomplete construction of the main dam, as it is receiving an unprecedented inflow.
The inflow of 19.30 lakh cusecs at the Polavaram project on Friday evening, was beyond the expectations. The outflow is 10.30 lakh cusecs. At the upstream spillway, the water level was +35 metres, and in the downstream of the spillway at +27 metres on Friday evening.