
New Delhi: The Ministry of Power said on Saturday it has issued a circular requesting the states to take action against imported coal-based power plants if they fail to maintain adequate coal stocks. "It has been reported that a number of power plants are taking much longer time than the norm in unloading coal from railway rakes which is affecting the turn-around time. CEA (central electricity authority) has been asked to monitor the unloading time at power plants and it has been decided that lesser number of rakes would be made available to such power plants where there is slackness in prompt unloading of coal from rakes," the Ministry of Power said.
"This step has been taken with the objective of maximising the utilisation of available railway rakes. Therefore, this aspect may be monitored at the level of State Government and unloading of coal may be ensured within the given norm," it said. The ministry said it has been monitoring coal supply situation in the country and has taken steps to ensure adequate coal supply and coal stocks based on the domestic coal received from Coal India Limited (CIL), Singareni Collieries Company Limited (SCCL) and Captive coal mines.