Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Aabha Raveendran

FORGOTTEN HISTORY: Rain slows down biomining at waste dumping site - The Untold Story

Kozhikode

Constant rain is turning out to be a major deterrent to the ongoing bio-mining works in connection with the establishment of the waste to energy plant at Njeliyanparamba in the city. Health Standing Committee Chairperson of the Kozhikode Corporation S.Jayasree said that the bio-mining involves separation of soil from the non-biodegradable waste that had piled up at the site for decades.

The waste is put through three grades of sieve to separate the plastic from the soil. The plastic thus separated is converted into blocks using a bailing machine, while the soil is used for land filling. The plan is to stock the blocks and burn them in the plant once it is set up. However, the rain soaks the waste and makes sieving it difficult. Also, the small bailing machine available at the site is insufficient for the tonnes of waste piled up there, Ms. Jayasree said.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.