Get all your news in one place.
100's of premium titles.
One app.
Start reading
Benzinga
Benzinga
Technology
Anusuya Lahiri

UNBELIEVABLE: Read why tsmc s us chip plant construction falls behind schedule - The Untold Story

  • Taiwan Semiconductor Manufacturing Co Ltd's (NYSE:TSM) advanced chip plant debut in the U.S. is three to six months behind schedule, Nikkei Asia reports.
  • TSMC planned to move in chip production equipment by around September 2022 but decided to postpone to around February or March 2023.
  • The deferral was mainly due to labor shortage, the on-and-off surge of COVID-19 infections in the U.S., complicated processes for obtaining the different types of licenses needed for construction.
  • TSMC can often reach the equipment move-in phase for new plants in Taiwan in around 15 months and, in some cases, as little as 12 months.
  • After installing the equipment, it can take up to a year for production lines to be qualified and production ramped up.
  • TSM admitted that production at the U.S. plant will not start until the first quarter of 2024. 
  • Unfamiliarity with a new geography, competition from Intel Corp (NASDAQ:INTC) for workers, supply chain concerns continue to pinch TSMC along with limitations of management capability and higher unit cost of making chips in the U.S.
  • Price Action: TSM shares traded higher by 3.73% at $124.24 on the last check Tuesday.
Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.