
Disruption following a train crash in Salisbury which left several people injured will continue for several days
(Picture: PA Wire)Crushed leaves suspected of causing a crash between two passenger trains were not cleared because of engineering work, an investigation has found.
Thirteen passengers and one member of railway staff required treatment in hospital as a result of the Fisherton tunnel crash after a South Western Rail (SWR) train ran 220 metres past a stop signal before striking a second service.