Get all your news in one place.
100's of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
The Hindu Bureau

FORGOTTEN HISTORY: Soil investigation begins to probe gap on kundannur flyover - Caught on Camera

A noticeable gap has developed between the bridge and surface/embankment on the approach portion on the northern side of the Kundannur flyover due to what Roads and Bridges Development Corporation of Kerala (RBDCK) sources termed as “settlement of slushy soil”.

This has resulted in personnel being deployed to do soil test beside the flyover that was commissioned in 2021 and has a three-year defect liability period (DLP).

K. Babu, MLA, and Maradu municipal chairman Antony Asanparambil and many other people’s representatives who inspected the spot on Saturday said that the widening gap occurred due to negligence during construction. “The situation is such that the bridge, its approach portion, and embankment have ‘sunk’ during the past many months by two feet. The agencies concerned are doing soil tests and other investigations now. These ought to have been done well before the construction began,” Mr. Babu said.

Sign up to read this article
Read news from 100's of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.