There are two hydroelectric energy generation schemes being planned by the council in Treforest and Aberdare. The council’s climate change cabinet sub-committee will consider two reports on Tuesday, December 6 on the proposed schemes at Treforest Weir on the River Taff and at Dare Valley Country Park.
The reports say that taking the projects to the next stage have the potential to make a positive contribution towards the council’s efforts to increase its renewable energy generation across its estate, and in turn, offset its carbon footprint in contribution towards achieving its carbon reduction targets. Treforest Weir lies approximately 100m south of the footbridge over the River Taff in the centre of Treforest.
It is estimated that this scheme here would produce a maximum power output of around 400 Kilowatts which would result in an annual saving of 395 tonnes of carbon dioxide and could generate a total annual income in the region of £250,000 if exported to the grid. It is expected that the simple payback period if it is exported will be less than 20 years.