Given the green light in 2012 HS2 was meant to cost £32.7bn with trains running by 2026.
The high-speed rail line was first proposed in 2009 with the aim of connecting the North of England with London via the West Midlands.
Given the green light in 2012 HS2 was meant to cost £32.7bn with trains running by 2026.
The high-speed rail line was first proposed in 2009 with the aim of connecting the North of England with London via the West Midlands.