NHAI’s Rs 30,491 crore outer ring road plan for Amaravati: 190-km six-lane corridor, 4 construction packages, 3 tunnels & 2 bridges over Krishna
Amaravati ORR Project: NHAI is preparing to begin work on Amaravati’s proposed six-lane outer ring road, spanning nearly 190 km with a total construction length of 195.13 km including a 5.2-km spur near Guntur. The Rs 30,491-crore project will be built in four packages and feature three tunnels and two…
The Economic Times ·