In 2025, Sizewell A sent over 15,000 tonnes of crushed turbine-hall concrete to Sizewell C; the recycled material was used as sub-base beneath new foundations
The repurposing of old nuclear station concrete has paved the way for innovative construction projects. With over 15,000 metric tons of crushed material put to good use, this initiative significantly reduced carbon dioxide emissions while minimizing landfill waste. Additionally, the local roads saw a drop in truck traffic, leading to…
The Economic Times ·